Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • The contractors for the Szolnok spa have brought a lawsuit against the city to secure payment of their final invoice

    • An exemplary model from Borsod – the synergy between father and son is driving Mento Csoportot forward

    • Class HE-DO brought the summer to a close with a family sports day

    • Summer BridgeCamp: SZABADICS shows young engineers what the construction industry is really like

    • A first-hand look at a career in engineering – Duna Group Szabadegyetem is back

  • Paks II
  • MKIF
  • What is being built?
    • Four blocks, 254 flats: structural work on the Csepel apartment block is progressing using PERI systems

    • A mental fitness course, a fire station, an eight-metre-high green wall – this is what the new NKE building looks like

    • A project on a scale not seen for decades is set to begin on Verseny Street

    • A hospital is being built in the heart of Budapest – it will be ready to admit patients in just under a year’s time

    • Another block of flats could be extended by two storeys in the Ferencváros regeneration area

  • Climate-X
    • Szeged is set to regenerate an entire neighbourhood as part of a large-scale green project

    • Regionális Szárazgazdálkodási Együttműködés was founded in Debrecen

    • The first municipal thermal power station in Transylvania is under construction

    • From the heating plant to the library – solar panels are to be installed on eight local authority buildings in Kiskunfélegyháza

    • The construction of huge water reservoirs would help to strengthen Debrecen’s drinking water supply

  • Bound track
    • Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line

    • Major renovation work is set to begin on the Buda section of tram line 6

    • Work has begun: the spur line will provide a direct rail link between Szombathely and Zalaegerszeg

    • Nearly 50,000 people travel on it every day – the refurbishment of the Cegléd main line continues

    • Drilling is also taking place beneath the railway: work on the Déli Körvasút project continues with the relocation of utility lines

  • Industry news
    • The refurbishment of Citadella has won an international award – 14,000 square metres of historic stonework have been restored

    • „It has reaffirmed that this is my path” – The 7th Duna Group Szabadegyetem has come to an end

    • The designers of flagship projects took home one of the most prestigious professional awards for the Mérnöki Kamara

    • A joint professional development day for the team: they can gain hands-on experience of the latest developments in the construction industry on the ÉMW course

    • A huge brush was driven through the Sopron tunnel on the M85 – with video

  • Magyar Építők

Városi Strand

  • Water management56 minutes ago

    Keszthely’s beach could be extended to include part of the neighbouring football pitch

    A new reception building, at least 5,000 square metres of additional green space, refurbished promenades and a link to the Balaton Cycle Route – the designer for the Városi Strand development in Keszthely has been selected.

More Posts
  • Latest
  • Popular
Water management2026. 10. 07.

Keszthely’s beach could be extended to include part of the neighbouring football pitch

Climate-X2026. 10. 07.

Szeged is set to regenerate an entire neighbourhood as part of a large-scale green project

Bound track2026. 10. 07.

Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line

Water management2026. 10. 06.

A new Youth Cultural Centre is being built in the city centre of Nyíregyháza

Current at2026. 09. 09.

A first-hand look at a career in engineering – Duna Group Szabadegyetem is back

What is being built?2026. 09. 09.

Romania’s largest Lidl shopping centre is being built in Bucharest

Climate-X2026. 09. 09.

Nyíregyháza Spartacus FC goes green – four hundred solar panels to be installed on the stadium roof

Bound track2026. 09. 15.

Nearly 50,000 people travel on it every day – the refurbishment of the Cegléd main line continues

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections – BC Zrt. – 7 October 2026.