Road building

Decades of backlogs made up - the road between Földeák and Maroslele renewed

Published

Road renovations around Hódmezővásárhely are progressing well. After about three months of work, the 4416 road linking Földeák with Maroslele has been opened, giving another 3.9 kilometres of good quality road.

With the opening of the road connecting Maroslele, located in the beautiful surroundings of the Körös-Maros National Park nature reserve, with neighbouring Földeák and Óföldeák on 5 September, a long-standing debt has been repaid. The replacement of the previously poor-quality road surface will make life easier for thousands of people, according to the article délmagyar.hu article.

As we previously reported, several roads in Csongrád-Csanád County will be renovated in the near future. The project, implemented under Duna Aszfalt Zrt., was carried out as part of a 1.5 billion forint non-repayable grant from the European Union, which included several similar investments. The investor Magyar Közút Nonprofit Zrt. spent approximately one third of this, HUF 538 million, on the renovation of the road between Földeák and Maroslele, of which

  • the existing surface has been profiled,
  • the replacement of the entire track structure in the necessary places,
  • followed by an asphalt levelling layer,
  • and then the construction of an asphalt wearing course and a new floor.

In addition, traffic signs were replaced and new permanent pavement signs were painted.

Source : Link

Popular