Road building

The M76 will be the most difficult motorway to build, with four valley bridges

Published

Among other things, a high-speed vehicle test track of almost 11 kilometres will be built to meet the test requirements of the ZalaZone.

Zalaegerszeg will also be connected to the Hungarian motorway network by the M76 expressway, Építési és Közlekedési Minisztérium (ÉKM) told MTI on Tuesday. They said the project will not create the most expensive motorway in Hungary, but the most modern Hungarian expressway section built in the most difficult terrain ever.

According to the summary, thirty-nine bridges and four viaducts will be built on the 31-kilometre motorway.

According to the ministry, the project will

  • the motorway access to the Zala duchy,
  • and the four-lane link to Keszthely,
  • as well as the connection to the airport in Mogilev,
  • And between Fenékpuszta and Sármellék, the main road 76 will also be upgraded,
  • and a state-of-the-art Maintenance depot will also be built in Nemesrádó, which will also be used for road maintenance.

Many innovative elements are incorporated

The expressway under construction is not only a section connecting Zalaegerszeg to the M7 motorway, but also a so-called "smart road", they stressed. They added that the project stands out from other expressways in Hungary because it includes elements and innovative solutions whose operational and accident experience can be used in future road developments. 

Include a movable baffle system, Rolling Barrier "roller barrier" protection system, Blue System "wire rope barrier" system, a motorized underrun prevention system, a head-on collision warning system, as well as smart lighting, solar panels, real-time sensors and automatic de-icing.

The project will also include the construction of a high-speed vehicle test section with a 26-metre crown width and a motorway cross-section of almost 11 kilometres, in line with the technical solutions required for the test requirements of the ZalaZone Automotive Test Track, ÉKM said in a statement.

Source : Link

Popular