Road building

Road to the Mercedes factory in Kecskemét to be widened

Published

The Duna Aszfalt will include a junction and the reconstruction of a cycle path.

The road to the Mercedes factory in Kecskemét may be widened by the Duna Aszfalt Zrt., according to an announcement on TED. The successful bidder will provide both the design and the execution of the widening works for a net contract value of HUF 617 million.

The development will include the addition of a new lane from the main road 54 on the southern outskirts of Kecskemét to the factory gate 2. According to the public procurement contract, the existing asphalt pavement will be extended with a new 3.50 m wide asphalt pavement lane, with a 1.50 m wide embankment on both sides and a drainage ditch. At Gate 2, a single at-grade left-turn lane interchange will be constructed on Daimler Road.

The project also includes the reconstruction of the cycle path alongside Daimler Road.

Source : Link

Popular