Road building

A town near the southern border gets a bypass

Published

A new route for the nearly 4-kilometre-long secondary arterial road will be built, and the design can begin thanks to the recently completed public procurement procedure.

Preparatory work can start on the southern bypass project in Baja: RODEN Mérnöki Iroda Kft. can prepare the export designs. As published on TED, the successful bidder will carry out the work for a contract value of HUF 187 million on the basis of the available permit design and building permit.

According to the Építési és Közlekedési Minisztérium announcement, the bypass will be built on a new route, a 3.93-kilometre-long, two-lane, second-lane arterial road. The bypass will connect the Bokodi road to the main road 51, which will be the starting point of the Bokodi road at the Eastern Boulevard, according to the previous public procurement.

The project also includes the design of the necessary roundabout junctions, as well as cycle lanes, service roads, bus stops, axle-weight measurement points and frame element culverts on crossing watercourses.

Source : Link

Popular