The route between Zákány and Gotalovo could improve access to the Hungarian–Croatian border region. The aim of the project is to develop transport links and strengthen regional cooperation.
The ÉKM invited five bidders to tender for the design of the 2x2 lane widening of the section of the main road 4 between Debrecen and Nyíregyháza. The route will link the two cities' economic...
The conditional design review procedure has been launched, and the final documentation for the 32 km 2x2 lane road can be prepared.
A new route for the nearly 4-kilometre-long secondary arterial road will be built, and the design can begin thanks to the recently completed public procurement procedure.
The public procurement has been successfully completed, and the consortium led by FŐMTERV (consortium member Kft. of RODEN Engineering) is working on the preliminary design of the 11 km long 2x2 lane road section.
A border crossing bridge was built by Colas.
Based on the documentation of Főmterv, the bridge was built by Hídépítő.