Road building

A new bridge is built over the Hejő river in a village near Miskolc

Published

In addition to the construction of the pedestrian crossing, further improvements are planned in the village in Borsod-Abaúj-Zemplén county.

The call for tenders for the construction of the Hejő bridge in Kistokaj has been published in the Electronic Public Procurement System.

According to the design area given in the notice, the new bridge will be built between Táncsics and Pacsirta streets over the stream, where there was no crossing until now. The bridge will be a single span, steel girder main girder, reinforced concrete deck structure with a steel bridge railing and a 13.8 m span. A one-and-a-half metre wide pedestrian walkway will be carried over the bridge, which will widen to 2 metres.

According to the Municipal Development Plan available on the municipality's website, the construction of the pedestrian bridge is part of a comprehensive development plan, which includes the development of green spaces along the Hejő stream, the creation of a new municipal centre, the construction of a promenade around Lake Kistokaj, the separation of the M30 motorway and the railway line through Kistokaj from the residential areas by a forest strip.

Source : Link

Popular