Road building
Another expressway reaches the border, an interstate contract has been signed
An agreement was signed between the Hungarian M80 motorway and the Austrian S7 motorway at the border between Hungary and Austria, Bálint Nagy, State Secretary for Transport, and Dr. Alexander Grubmayr, Austrian Ambassador to Hungary, Építési és Közlekedési Minisztérium reported.
The new cross-border expressway connection to be built near Szentgotthárd will be completed in 2025, according to the agreement. The 2×1 lane M80 expressway leading from the town of Körmend to Rábafüzes, located near the national border, was opened to traffic in autumn 2021: The 28.85-kilometre section of road is being built under general contracts Duna Aszfalt Zrt. and Mészáros és Mészáros Kft...
Currently the M80 is back on the main road 8
The motorway, which bypassed the settlements, efficiently diverted traffic and opened up the industrial areas of the region, was reconnected to the main road 8 before the border until the Austrian motorway was completed. The roundabout currently closing the M80 is about one and a half kilometres from the Austrian border as the crow flies.
The agreement, signed on 23 July, will link the S7 Fürstenfeld motorway, which is expected to reach the state border in 2025, and the M80 motorway between Szentgotthárd and Heiligenkreuz im Lafnitztal (Rábakeresztúr).
ÉKM's statement concludes by stressing that the civilian government has made significant progress in recent years in developing road infrastructure and improving Hungary's international connectivity: while in 2010 only three expressways reached the national border, soon eleven will do so.
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
