Road building
The bypass of the Bács-Kiskun county town is completed with a bridge over the railway
A long-awaited investment has been completed in Soltvadkert, with the handover of the entire 8.8-kilometre section of the eastern bypass, which was built partly as a joint section of roads 53 and 54 and partly as a section of the 53 main road. The foundation stone for the project was laid in the autumn of 2022.
The northern half of the 8.8-kilometre, 2×1 lane route completed during the development was opened to traffic in September. The general contractor for the entire project is based in the region, but in recent years has been active throughout the country several giant project . The Speciálterv Kft. and Uvaterv Zrt. also participated in the planning of the project, with the former compiling the implementation, technology and realisation plans.
The ceremony was attended by Prime Minister Viktor Orbán, Minister of Construction and Transport János Lázár, Member of Parliament Sándor Font and Mayor of Soltvadkert Ferenc Temerini.
Five roundabouts, separate level crossing and cycle underpass
The investor summarised this in its prospectus Építési és Közlekedési Minisztérium:
The 8.8 km of new road has been completed with 5 roundabout junctions, including
- for 5316 j. Soltvadkert internal link road,
- on the municipal road to Lake Vadkerti,
- on the secondary main road No 54 Kecskemét-Soltvadkert-Sükösd,
- the 5405 j. Soltvadkert-Szeged link road
- and are located on the existing route of the 53 motorway.
A separate level railway crossing was also built over the Budapest-Kelebia railway line No. 150, northwest of Soltvadkert: we reported on the construction work in a separate article , according to its technical parameters, a two-span, three-support, prefabricated prestressed reinforced concrete bridge with reinforced concrete deck slabs was constructed, with a structural length of 46.89 metres.
A cycle underpass has also been built at the roundabout junction of the bypass and the road to Lake Vadkerti. Last but not least, a 156 m amphibious crossing and 4 km of associated buffer panels, around 12 km of guardrail and 1,050 m2 of bird protection wall were also completed.
Speaking at the ceremony, Prime Minister Viktor Orbán said that in his assessment Soltvadkert and Bács-Kiskun county is one of the winners of the government's work. He said:
The role of the region will become even more important in the future, as the government is creating a new economic zone in the southern regions of Hungary. He said that the entire southern Hungarian region should be made strong, resilient and independent, with HUF 330 billion of funding planned in next year's budget.
Significant investments are underway in Szeged and Kecskemét, and the bypass road in Baja is also nearing completion, according to magyarnemzet.hu according to Viktor Orbán, indicating that Pécs is preparing.
How Kecskemét and Szeged are developing
Our newspaper also reported on the significant railway developments expected in Kecskemét and the surrounding area during the current visit of János Lázár, Minister of Construction, on his tour of the country. We wrote about the investments in Szeged here about investments in Szeged: in addition to the BYD factory under construction in this city, related infrastructure developments and, among other things, the Science Park and Rheinmetall plants are also considered to be significant active mega-projects. In Science Park, the consortium of Colas Út Zrt. and Délút Kft. consortium undertook significant work, which we reported on earlier in a photo report .
Soltvadkert becomes a cleaner, quieter town
János Lázár announced in his Facebook post about the event in Soltvadkert: „While in 2010 only 6 million people had access to the 2×2 lane road network within 30 minutes, by the end of 2024 this number will exceed 8.5 million. By the end of the cycle, every Hungarian will be within half an hour's reach of the expressway network. This is our goal, and we are working towards it now and will continue to do so in the future.”
He added: „From today, traffic will be open on the Soltvadkert bypass section of the 53 main road, which will greatly relieve the town of through traffic. From now on, the residents of Soltvadkert will be able to travel in a much cleaner, quieter and more liveable environment, and in greater safety.”
A 40-year dream come true
Member of Parliament Sándor Font stressed at the opening ceremony that the bypass is the realization of a 40-year dream and a 40-year plan, as Soltvadkert has had a high traffic volume for several decades.
Among other things, he said that at the local level "the city's population retention would be increased by the construction of a 50-hectare industrial park, which would provide space for businesses that would make it worthwhile for young people who have completed their studies to return to the municipality."
Mayor Ferenc Temerini first said that roads 53 and 54 were declared secondary main roads in 1934, but only became real main roads in the mid-1960s. The more than three-and-a-half kilometre section of the two roads through Soltvadkert was subject to a rare amount of traffic, even at national level, he said. He then summarised the long process that led to the realisation of the bypass and highlighted the fact that the project was carried out by the SOLTÚT Kft. of Bács-Kiskun County.
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November

