Road building
A new access road will also be built for the 57 motorway, which will be built as a four-lane road on the lowland side
More elements will be added to the transport development related to the construction of the Danube Bridge in Mohács, according to a Építési és Közlekedési Minisztérium press release. The government has also decided to widen the main road 57, as well as to build a new junction, access road and rest area as part of the project, which was discussed by János Lázár, Minister of Construction and Transport, with Mayor Gábor Pávkovics in November during the ministry's tour of the country.
As previously indicated, the Mohács Danube bridge project, which will be built in accordance with the Duna Aszfalt Zrt. design, will involve the construction of a four-lane road from the M6 motorway to Mohács, including the conversion of the existing section of main road 57 into a four-lane road. At the same time, our newspaper already indicated in January this year that, contrary to earlier plans, a four-lane road will also be built on the Danube side of the Great Plain from Mohács to main road 51 (reaching 51 in the Csátalja area): This was confirmed by the Official Gazette 59th issue of the Official Gazette on 30 December last year.
Homorúd municipality gets access to the new motorway
Today's announcement by ÉKM confirmed this news, indicating that the development of the Mohács Danube Bridge and the associated road network will see the entire section of the 57 motorway constructed with 2×2 lanes.
The summary also shows that a rest area will be built in the Sárhát-Újmohács area, and an interchange and access road will be built to improve accessibility to Homorúd.
The total cost of the investment elements is HUF 80 billion, according to the announcement. A total of 28.8 kilometres of motorway will be built between Highway 51 and the M6 motorway, including the construction of the new 756-metre-long Danube bridge in Mohács.
Improving access to the M6 motorway from Serbia
The ÉKM stresses that the new Danube bridge and the related road development are not only important for the development of the municipality and the region, but are also of particular importance for the more efficient organisation of transit traffic between the Balkans, Serbia and the European Union. The modernisation of the border crossing in Hercegszántó and the development of roads 57 and 51 will enable access to the M6 motorway from Serbia. Preparations are also underway to upgrade the border crossing points at Röszke and Tompa in order to organise southern transit traffic more efficiently.
Source: Link
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
-
Bound track 2026. 10. 08.
Déli railway station is set to undergo a major refurbishment, paving the way for double-decker trains
