Road building
M1 six-lane upgrading: dozens of motorway bridges to be upgraded
We regularly report on the preparations for the development of the M1-es autópálya, which is set to enter the main construction phase within a few months. Our newspaper was the first in the Hungarian press to report on this massive investment: as part of a comprehensive interview published at the end of October last year with Tamás Németh, the investor MKIF Magyar Koncessziós Infrastruktúra Fejlesztő Zrt. our readers were able to learn important details from the CEO. We were thus informed about the preparatory work currently underway, as well as the fact that MKIF Zrt. will commence the actual expansion by 1 September 2025 at the latest.
The project involves the resurfacing of about 80 km of the M1 from the M0 motorway to the Concó rest area and the widening of the M1 to 2×3 lanes + ITS lanes (the latter abbreviation stands for Intelligent Stopping Lane).
As it does regularly, MKIF has now reported on its Facebook page reported on the preparatory work. This time, they provided new information about the test pile driving and posted several spectacular photos.
These works were already underway in November last year and have been ongoing ever since: this is how MKIF is preparing for the expansion of the motorway, which will require dozens of bridges to be rebuilt or completely rebuilt, as the expanded 2×3 + hard shoulder will no longer fit underneath them.
The test piles are used to check the soil's capacity in the areas concerned, they remind.
Source : Link
-
Kirakat 2026. 10. 01.
A leading machinery distributor in the construction and haulage sectors is building a new service centre and extending its existing premises
-
Industry news 2026. 10. 02.
Hungary has joined the single electricity market
-
Railway development 2026. 09. 29.
The railway line leading to the Hungarian border is also set to be upgraded as part of Croatia’s large-scale development programme
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
