Industry news
Strabag uses green energy to build the Belgrade Waterfront neighbourhood mega project
In a major project on the banks of the Sava, the Austrian construction company has fitted 16 container offices with solar panels to power their work areas near the construction site with green electricity.
It published green news and a short video about the large-scale, multi-year project to develop an entire city district, the Belgrade Waterfront construction project, on the Strabag-csoport international Facebook page. As they wrote, the development will create a new living space in Serbia directly on the waterfront.
In the project, 16 containers on the construction site have been equipped with solar panels to generate green electricity for the large-scale container offices that will serve the new blocks next to the already completed buildings. A total of 102 panels, each with a capacity of 380 Wp, can produce 38 kW of power at peak times.
The energy generated is used by many electronic devices in offices, such as laptops, monitors, cooling and heating systems.
Source : Link
-
Road building 2026. 08. 05.
The main road leading to a key tourist destination in Bihar is being upgraded using cold recycling technology
-
What is being built? 2026. 08. 06.
Paks II.: What does the new milestone for Unit 5 mean in the context of the review?
-
Climate-X 2026. 08. 05.
STRABAG is relieving the strain on the electricity system through plant shutdowns and reorganised production
-
Bound track 2026. 08. 03.
Work on the extension of Metro Line 3 is set to begin