Industry news
The Etele Plaza project and the reconstruction of the church ruins in Kivesd were also topics of the Mapei engineering conference
Amidst great interest, Mapei Kft. held its professional training conference at Lurdy House on 6 June 2024. The event was organised for designers, structural engineers and engineers working in construction.
One of the interesting aspects of the event was the presentation of unique and complex case studies of an already implemented domestic investment. Each of these projects and the innovative Mapei solutions used were presented by designers, contractors and material manufacturers.
This approach to the professional tasks and construction situations that arise during projects brought the perspectives and tasks of the different construction roles into the open and into dialogue with each other.
Practical aspects were also taken into account
Another special feature of the conference, which is usually a rarity at professional events for engineers, was the opportunity to watch a practical demonstration of the application of the given topic.
The training event covered four key technical areas with presentations from designers, contractors and manufacturers:
- Solutions and possibilities of structural reinforcements during the renovation of the buildings of the Majority of Szántódpuszta
- Waterproofing a challenging building: the ETELE Plaza project
- Special professional solutions for building reconstruction in the restoration of the Kövesd church ruins in Asovő, in the framework of the Roma Wanderer Programme
- Trendy floor coverings - renovation and extension of the building of the Antal Csermák Elementary Art School
The participants came away from the day-long training session with new perspectives and useful information, and at the end of the event, the winner of a prize draw was also awarded a study trip to Spain.
They approached the project from all sides
The invited guest speakers, from both the design and construction sides, contributed with their high-quality presentations to the better understanding of the different roles of the professionals, and to a more harmonious cooperation in the course of the professionally challenging projects.
The Mapei experts, engineering consultants, product line managers and application technicians gave an authentic insight into the rich portfolio of Mapei solutions and partner support services, and how Mapei can always be relied upon, regardless of the current market situation.
Professionals can contact the construction company on a number of issues
The Mapei Kft. is available on demand to all design and construction stage partners with its free services:
- credit courses
- aldiagnostic tests
- help in sizing structural reinforcements and concrete floors
- software to help designers (Mapei Composer, Mapei Structural Design, Mapei Design Fix)
- related materials, systems from the manufacturer
- continuous product development
- special products and solutions
- full range of products
- permanent stock
- logistics, delivery within 48 hours
- technical application assistance
- free expert advice, even on the spot
- prompt handling of complaints
- personal contacts with market players
- project support
- website, social media presence
- publications, guides
- events, training, even abroad
- car rental
In addition, those interested in the company's latest developments can subscribe to the Mapei newsletter for designers.
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
