Industry news
This is what the new Hungarian Transport Museum in Debrecen will look like
Following a strictly anonymous professional evaluation, an architectural design by an office in Debrecen won the Hungarian Transport Museum's ideas competition, according to János Lázár, Minister of Construction and Transport Facebook post. As the minister pointed out, according to the jury, the work by Archiko Kft. was the most unique and iconic of the 18 entries received, meeting the criteria of the competition.
The Minister also briefly summarised the aim of the tender: the Hungarian Transport Museum at the Debrecen site was expected to be an emblematic building with a forward-looking, automotive-centred exhibition, meeting the latest museum technology requirements and complementing the visitor centre of the neighbouring BMW Group factory.
The second prize was awarded to DPI Design, which stands out for its striking architectural - landscape architecture concept. The jury found the spiral's self-reversing plan interesting, creatively combining traditional museum structures with modern forms.
The third place went to the DAW Építész Studio entry, which the Minister said should be all about motoring, with freedom, speed and innovation.
Source : Link
-
Road building 2026. 08. 05.
The main road leading to a key tourist destination in Bihar is being upgraded using cold recycling technology
-
What is being built? 2026. 08. 06.
Paks II.: What does the new milestone for Unit 5 mean in the context of the review?
-
Climate-X 2026. 08. 05.
STRABAG is relieving the strain on the electricity system through plant shutdowns and reorganised production
-
Bound track 2026. 08. 03.
Work on the extension of Metro Line 3 is set to begin