Industry news
The prize, which brings together the construction and communications industries
Our newspaper has already covered the increasingly prominent role of marketing communication in the construction industry in numerous articles. It can be considered a milestone that the Media Department of Építési Vállalkozók Országos Szakszövetsége (ÉVOSZ) Media Division, established at the end of 2019, held its first conference in April 2024, where communication and marketing professionals from the sector exchanged experiences and laid the foundations for a strong community.
The profession was further strengthened by the fact that the Media Department of ÉVOSZ – also for the first time – recognised the construction industry with a triple award family communication and marketing. The awards were presented on 12 December 2024 in Budapest at the year-end gala of the National Association of Building Contractors. The aim of the section is to encourage this value-creating work and to put the construction industry on the marketing map, Péter Kincses, chairman of the ÉVOSZ Media Section, told our newspaper earlier.
A reminder of the prizes and winners:
Building Industry Markething Communication Person of the Year Award: Szilvia Mészáros (Mapei Kft.)
Builder of the Year Marketing Campaign Award: Újház Pyramid Building Kft.
Construction Industry Corporate Responsibility of the Year Award:shared between Szabadics Zrt. and Market Építő Zrt.
Equal prizes, with different characters
The awards themselves are valuable: their designer, DVM Group, and their implementer, the KÉSZ Csoport K-ARTS Art Foundation also considered them to be of outstanding importance – and so these works of art, which are at once architectural, artistic and poetic, came into being.
The idea is to put the domestic construction industry and construction activity in the spotlight. With a poetic gesture, it "opens a window" and "illuminates" the figures and companies that have performed outstandingly in the past year - Attila Vámosi, communications and marketing director of DVM Group, the award's designer, told our newspaper.
"Three different shapes appear on the same principle, which do not compete with each other at all. They are identical in mass and size, yet different in appearance. We wanted to point out that the prizes are completely equal, but have different characters", he added.
The creative concept as common ground
Each of the three prizes is a building contour made of a homogeneous sheet of metal bent to shape, symbolically representing abstract architectural elements. The openings - doors, gates, windows - which allow light into the interior, appear open-worked and bent outwards, functioning as independent sculptures.
"Marketing communication in architectural design also relies on the power of storytelling. Both seek to make ideas and values visually and emotionally relatable. Just as architectural design gives form to the spaces of life, marketing shapes the narrative and identity of brands, both fields are the art of connecting with people"
- Attila Vámosi shared his thoughts with us about what inspired them to do the job. He added: "Architecture and marketing share a creative concept that balances aesthetics, function and human experience, reflecting people's needs and desires while creating lasting value."
"With the ÉVOSZ Media Awards, we found a parallel in these values and thought we would offer our knowledge and creativity to a new cause. The work of the Chapter will create a set of values that will be important for all those involved in the construction industry in the long term, giving back, shaping and promoting a positive image of the profession. In this world of norms, the two organisations have found a good partnership", concluded the Communication Director of DVM Group.
K-ARTS: where artists' dreams come true
The professional awards of ÉVOSZ were prepared by the Art Foundation of KÉSZ Csoport K-ARTS on the basis of the designs received. This organisation is the custodian of the KÉSZ Csoport contemporary art collection. The collection has a strong industrial flavour and is unique of its kind.
The foundation is involved in several applied design projects in the applied arts, from small sculptures to interior design and public art. István Árvai is the chairman of the foundation's board of trustees and the realizer of the ÉVOSZ awards.
The success of the construction industry requires several dimensions
As we learned: even with the tight deadline, the three different shapes were created using the same materials used in the construction industry: die-cut, edge-bent, copper-painted aluminium sheet and polished limestone slabs as a base. The plinths were laser-engraved with labels bearing the names of the awards.
"With the KÉSZ Csoport, we think it's important to show that there are many more dimensions to building success than just precise design and construction. The role of conscious communication and marketing is a clear success criterion for everyone in the media industry, but we wanted to make sure it reaches even more people. That's why we felt it was important to create and support the Media Awards" - said Károly Benedikt Benedikts, KÉSZ Csoport Marketing and Corporate Communications Director.
He added: "Our group's art foundation K-ARTS is delighted to undertake the production, as it has already shown in numerous craft projects that we can deliver an art finish to the same high standard as any of our completed or ongoing construction projects."
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
Current at 2026. 10. 05.
Sofitel Hotel is the only Hungarian project in the running for the Dalux Award 2026 award – Watch the video too!
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
