What is being built?
Modernity and functionality: the renewal of the Hungarian Institute of Foreign Affairs
The building at 13-15 Bérc Street, which houses the Institute of Foreign Affairs and Foreign Trade and the Hungarian Diplomatic Academy, is undergoing complete renovation and conversion, according to the institute's website institute's website. The government decided to provide the necessary funding for this in April 2022.
The CCI has been working closely with the Investment Agency, which is responsible for the renovation, and the appointed architectural firm over the past year and a half to ensure that the villa, built in 1937 to the design of Béla Málnai, is transformed into an open research and conference centre that meets 21st century standards and can support the effective operation of both the CCI and the MDA.
The renovation will renew the exterior, the interior and the entire machinery of the Bérc Street headquarters. And by moving the walls, spaces will be created that will make it easier to serve events. The insulation works will eliminate the permanent dampness of the walls and will also make the four-storey building more energy efficient. The renovated headquarters will also be fully accessible.
By reducing the parking spaces, the green area will be increased, with trees, more than two thousand shrubs, more than four thousand perennials and copper binders planted in the garden. An automatic irrigation system will provide adequate moisture.
The renovation work is expected to take two years. During the transition period, the CCI will move to the art nouveau Baruch Palace at 44 Bajza Street, in the heart of the diplomatic quarter, which is also under its own management in our own offices.
Each level is functionally designed
The floors of the building, with a net floor area of 2,134.46 square metres, will be converted according to their functions. According to the call for tenders published on TED, which is seeking a contractor for the renovation,
A workshop space will be created in the basement, with a two-storey ceiling, which can be used as a library or as a meeting/lecture room. This space will be enclosed by a circular storage/publication room and the mechanical room. In the basement there will be offices with an associated kitchenette.
The east wing will have a guest apartment and a changing room with shower for workers arriving by bike. This floor will also house the offices for the building's operations, as well as the ground floor auditorium and bathrooms. The lecture theatre and its ancillary facilities will be located on the ground floor in the west block.
The main entrance will lead to the foyer, from there you can access the salon through the walkways, and from here you can approach the auditorium and the terrace facing the courtyard. The eastern block will have offices with wet rooms. The upstairs level will house the executive offices and secretariats. The main part of the attic is occupied by the engineering department, with a podcast room and a non-permanent office.
The ornate main staircase leading from the basement to the first floor will remain after the renovation.
Source : Link
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
-
Current at 2026. 10. 13.
It’s time to provide information to those in the sector – that’s what this year’s Építőipar Summit was all about
