What is being built?
Renovation and extension of the Návay Technical Centre in Makó
The Návay Lajos Technical School and College in Makó will become a state-of-the-art vocational training institute that meets the most modern educational and industry requirements, as its building on Bajza Street will be renovated and expanded with EU support, said Norbert Ambrus, chancellor of the Vocational Training Centre in Hódmezővásárhely on Friday. The 625 million HUF construction project is being carried out by the Szeged-based RZB Invest Kft.
Modernisation is essential
At the event presenting the two billion HUF project, Norbert Ambrus stressed that in an era of accelerating technological change, it is essential to expand and continuously modernize the training structure.
The aim of the development is to create an educational environment in the fields of mechanical, electronic and electrical engineering, specialised mechanical and automotive engineering, which will enable students to acquire state-of-the-art skills and knowledge, the Chancellor said.
Total transformation
Over the next 13 months, more than 2,000 square metres of the school complex, which has been built in several phases since the early 1900s, will be renovated. The facade will be insulated, windows and doors will be replaced, bathrooms will be modernised, a heat recovery ventilation system will be installed and the building will be heated and cooled by a heat pump.
The building will be enlarged with a 435 square metre extension, including new changing rooms and a classroom for practical training. In the attic there will be a 280 square metre mechanical engineering cabinet, which will house measuring, welding, CNC, electrical and mechatronics laboratories, said Norbert Ambrus.
The project will also include the purchase of technical equipment for the training, including an Industry 4.0 production line and a VR simulation system that will allow students to practice in almost realistic conditions, for around HUF 600 million, the expert said.
Source: Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
