Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • The contractors for the Szolnok spa have brought a lawsuit against the city to secure payment of their final invoice

    • An exemplary model from Borsod – the synergy between father and son is driving Mento Csoportot forward

    • Class HE-DO brought the summer to a close with a family sports day

    • Summer BridgeCamp: SZABADICS shows young engineers what the construction industry is really like

    • A first-hand look at a career in engineering – Duna Group Szabadegyetem is back

  • Paks II
  • MKIF
  • What is being built?
    • The care home in Fertőd is to be refurbished

    • This lorry terminal will relieve pressure on Debrecen’s road network, and this is how the huge car park is being built

    • It has great potential, yet it feels unwelcoming: more greenery would make Boráros Square a more liveable place

    • They are radically reducing the environmental impact and noise levels at Liszt Ferenc Airport

    • The ‘Mushroom’ will remain in Örs vezér Square – the detailed plans for the square’s regeneration may be finalised

  • Climate-X
    • Desert wind farms, alpine solar power stations – brilliant engineering and construction solutions for harnessing renewable energy

    • A cooling vest, greener tarmac and digital work management: this is how the STRABAG is responding to climate change

    • The area around Malom Lake in Oroszlány has been revitalised with the addition of an owl castle and a viewing hill

    • This is how flash floods on the vineyard-covered hills in the Pécs conurbation are being prevented

    • Szeged is set to regenerate an entire neighbourhood as part of a large-scale green project

  • Bound track
    • The world’s most beautiful tram line? A fixed-track line has been built on Finland’s longest bridge

    • From the tram tracks to the trees’ root zones: complex design work lays the foundations for the second phase of the Buda Interconnection project

    • Plans are in place for a new depot and track modernisation to accommodate the CAF trams

    • Alpine engineering techniques are also being used to protect the railway in the Danube Bend

    • This time, speed limits are being lifted on the Hatvan–Szolnok line

  • Industry news
    • An innovative, distinctive PHOENIX Logistics Centre has been established in Győr: the Óbuda Group has reimagined the spaces for pharmaceutical logistics

    • Are you a marketer? Make yourself visible!

    • The SZABADICS and BME programmes have joined forces: together, they are strengthening the next generation of engineers

    • The road construction sector celebrated its half-century anniversary in Eger

    • Spectacular arches, ingenious solutions – the designers of the FŐMTERV present Venice’s award-winning bridge

  • Magyar Építők

Road 1111

  • Water management6 hours ago

    Four ‘1’s in a row: Esztergom’s transport headache has been resolved

    A new roundabout has been built at the junction on Road 1111, which is prone to traffic jams and accidents.

More Posts
  • Latest
  • Popular
Road building2026. 11. 11.

It’s time for a refurbishment: HEDO is carrying out work on one of Miskolc’s key transport routes

Water management2026. 11. 11.

Four ‘1’s in a row: Esztergom’s transport headache has been resolved

What is being built?2026. 11. 11.

The care home in Fertőd is to be refurbished

Industry news2026. 11. 10.

An innovative, distinctive PHOENIX Logistics Centre has been established in Győr: the Óbuda Group has reimagined the spaces for pharmaceutical logistics

Water management2026. 10. 13.

A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway

Industry news2026. 10. 18.

The road construction sector celebrated its half-century anniversary in Eger

Industry news2026. 10. 16.

Spectacular arches, ingenious solutions – the designers of the FŐMTERV present Venice’s award-winning bridge

Industry news2026. 10. 13.

Off to Lake Balaton – Contech for the third time!

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections - BC Zrt. - 11 November 2026.