Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • The contractors for the Szolnok spa have brought a lawsuit against the city to secure payment of their final invoice

    • An exemplary model from Borsod – the synergy between father and son is driving Mento Csoportot forward

    • Class HE-DO brought the summer to a close with a family sports day

    • Summer BridgeCamp: SZABADICS shows young engineers what the construction industry is really like

    • A first-hand look at a career in engineering – Duna Group Szabadegyetem is back

  • Paks II
  • MKIF
  • What is being built?
    • This lorry terminal will relieve pressure on Debrecen’s road network, and this is how the huge car park is being built

    • It has great potential, yet it feels unwelcoming: more greenery would make Boráros Square a more liveable place

    • They are radically reducing the environmental impact and noise levels at Liszt Ferenc Airport

    • The ‘Mushroom’ will remain in Örs vezér Square – the detailed plans for the square’s regeneration may be finalised

    • A centre is being built for couples struggling with infertility under project Debreceni Egyetemen

  • Climate-X
    • Desert wind farms, alpine solar power stations – brilliant engineering and construction solutions for harnessing renewable energy

    • A cooling vest, greener tarmac and digital work management: this is how the STRABAG is responding to climate change

    • The area around Malom Lake in Oroszlány has been revitalised with the addition of an owl castle and a viewing hill

    • This is how flash floods on the vineyard-covered hills in the Pécs conurbation are being prevented

    • Szeged is set to regenerate an entire neighbourhood as part of a large-scale green project

  • Bound track
    • From the tram tracks to the trees’ root zones: complex design work lays the foundations for the second phase of the Buda Interconnection project

    • Plans are in place for a new depot and track modernisation to accommodate the CAF trams

    • Alpine engineering techniques are also being used to protect the railway in the Danube Bend

    • This time, speed limits are being lifted on the Hatvan–Szolnok line

    • Test trains are rattling along the new Slovenian railway viaduct

  • Industry news
    • Are you a marketer? Make yourself visible!

    • The SZABADICS and BME programmes have joined forces: together, they are strengthening the next generation of engineers

    • The road construction sector celebrated its half-century anniversary in Eger

    • Spectacular arches, ingenious solutions – the designers of the FŐMTERV present Venice’s award-winning bridge

    • A space brimming with information and encounters – that’s what the Infotér CONTECH was like

  • Magyar Építők

Debrecen Észak-Nyugati Gazdasági Övezet

  • What is being built?1 hour ago

    This lorry terminal will relieve pressure on Debrecen’s road network, and this is how the huge car park is being built

    „KE-VÍZ 21” Zrt./span carries out complex road, utility and building construction works.

More Posts
  • Latest
  • Popular
Climate-X2026. 11. 08.

Desert wind farms, alpine solar power stations – brilliant engineering and construction solutions for harnessing renewable energy

What is being built?2026. 11. 08.

This lorry terminal will relieve pressure on Debrecen’s road network, and this is how the huge car park is being built

Road building2026. 11. 07.

Rákospalota’s key transport corridor could be revitalised using the ‘Sponge City’ approach

Water management2026. 11. 07.

The west wing of the Janus Pannonius Múzeum is being converted into an archaeological exhibition

What is being built?2026. 10. 10.

The Mercedes nursery in Kecskemét has doubled its capacity

Bound track2026. 10. 12.

Railway development is coming to the Hungarian Puszta too: Hortobágy station is being refurbished with an accessible platform and track works

Water management2026. 10. 13.

A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway

What is being built?2026. 10. 12.

The new industrial production hall could boost economic development in Matyóföld

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections - BC Zrt. - 8 November 2026.