Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • Sunshine, Lake Balaton, sails – and the key issues facing the domestic property market at the Property Regatta

    • Grab your tools – The large-scale workshow for builders and gardeners is about to begin

    • Apples and pears: according to MKIF, no valid conclusions can be drawn about the operation of the M6 from technical parameters that are not comparable

    • The Miskolc cave spa was completed in time for 20 August thanks to some ingenious solutions – a photo gallery and on-site report

    • A historic landscape where every stone has a story to tell – the English Garden in Tata is being restored

  • Paks II
  • MKIF
  • What is being built?
    • 187 new parking spaces will ease congestion around the Nyíregyháza Stadium

    • A new urban complex is taking shape on the site of the Szikra Printing Works – the Parkside Residence has already reached its highest point

    • The 25,000-square-metre training centre at the Ludovika Campus, complete with a fire station and halls of residence, has been completed

    • From the town centre to the spa – a cycle path over three kilometres long is being built in Kiskunmajsa

    • One of Lidl’s largest European logistics centres has been handed over in Kiskunfélegyháza

  • Climate-X
    • A major US investment is boosting energy investment in Romania

    • Kaposvár’s ‘sponge city’ development could serve as a national model programme

    • New car parks with permeable surfacing are being built in Zugló – rainwater will be retained on site

    • It is not an empty building that is energy-efficient, but one that is managed intelligently

    • STRABAG is relieving the strain on the electricity system through plant shutdowns and reorganised production

  • Bound track
    • The SWIETELSKY Vasúttechnika Kft. has been declared the winner in two railway development projects

    • Renovation work begins on one of the country’s most important railway bridges

    • One of the country’s most important railway lines is set to undergo a major upgrade

    • Seven and a half kilometres of railway track are to be renewed between Kiskunfélegyháza and Gátér

    • New pedestrian crossings and a junction with traffic lights are being built in Angyalföld

  • Industry news
    • A new co-CEO has joined KÉSZ Csoporth

    • The Sándor Wekerle Housing Construction Programme – up to two billion euros could boost the Hungarian housing construction market

    • The Duna Aszfalt redeems the bonds issued under the GED Africa project

    • A major construction contract is speeding up the construction of the Paks sill

    • Students were introduced to the high-tech construction industry at BME’s field camp in Göd

  • Magyar Építők

Nyíregyháza Stadium

  • What is being built?3 hours ago

    187 new parking spaces will ease congestion around the Nyíregyháza Stadium

    From preparation to planting, every stage of the process was carried out by the specialists from KE-VÍZ whilst carrying out the task.

More Posts
  • Latest
  • Popular
Road building2026. 09. 07.

M1 extension: the 44-year-old bridges are being demolished, whilst traffic is being diverted to the section of the motorway that has already been completed

Road building2026. 09. 07.

Previous plans are being dusted off, and a decision may finally be made on who will design the next sections of the cycle route along the Rákos Stream

What is being built?2026. 09. 07.

187 new parking spaces will ease congestion around the Nyíregyháza Stadium

Road building2026. 09. 07.

The roadworks in Újpest have reached the halfway point: a new phase of works is set to begin on István út and Pozsonyi utca

Bound track2026. 08. 17.

New pedestrian crossings and a junction with traffic lights are being built in Angyalföld

Current at2026. 08. 17.

A historic landscape where every stone has a story to tell – the English Garden in Tata is being restored

Industry news2026. 08. 18.

Students were introduced to the high-tech construction industry at BME’s field camp in Göd

What is being built?2026. 08. 18.

New paving, a playground and visitor facilities are being planned for the Várkör area in Pannonhalma

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections – BC Zrt. – 7 September 2026.