With its slender structure, the pedestrian and cycle bridge over the M7 motorway, designed by Főmterv, is also a spectacular sight. Its concept was developed into a work of art based on forward-looking solutions.
We talked to Gábor Boros, bim.GROUP Production Design Team Leader, about Rozelle Interchange's special project, Hungarian involvement and differences in design approaches.