The pedestrian and cyclist crossing built by SWIETELSKY Magyarország was chosen by a vote of the profession.
Construction of the project has been suspended since the end of 2023 due to contractual problems between the Slovak partner and the bridge contractor, according to ÉKM.
A border crossing bridge was built by Colas.
Based on the documentation of Főmterv, the bridge was built by Hídépítő.