Road building
Development of the Zala border cycling network continues
Kerkateskánd, Lovászi and Tornyiszentmiklós are connected by a new, more than three-kilometre-long cycle path, which was built by the Zala County Local Government from the Regional and Settlement Development Operational Programme funds, connecting to the existing cycle paths in the area, according to information provided by the local government. As previously reported, the development was divided into two sub-projects, with the Szombathely-based Inter Mobility Kft. implemented.
The 3.1-kilometre cycle path development, now completed with more than 434 million forints, is a continuation of the 10.3-kilometre cycle path previously completed in Lenti, Kerkateskánd, Szécsisziget and Csömödért.
The aim of the project was to create a cycling-tourism route between the settlements, which would result in a boost to the economy and employment through the tourism exploitation of the cultural, built and natural heritage of local and regional importance.
Investments are not over yet
As a continuation of the Széchenyi 2020 project, Zala Two Wheels, a new development will be launched this year to provide access to Letenye, Becsehely, Tornyiszentmiklós, Dobri, Kerkaszentkirály, Muraszemenye and Murarátka.
This investment will involve the construction of 25 kilometres of new or designated cycle paths in 22 phases.
The Communication also points out that the Slovenian border cycling development is closely linked to the new cycle route between Lendva and Pince in Slovenia. The technical handover of the road, which already has a valid construction permit, is expected in early 2025.
Source : Link
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
-
Current at 2026. 10. 13.
It’s time to provide information to those in the sector – that’s what this year’s Építőipar Summit was all about
