Road building

Connection of Satu Mare to the European high-speed rail network to start soon

Published

An 11-kilometre-long four-lane road will be built between Satu Mare and Óvári, and the M49 from the M3 to Csenger will continue on the other side.

The National Road Infrastructure Management Company of Romania (CNAIR) has launched a public tender for the construction of a motorway linking Satu Mare-Nemet with Hungary, the Romanian economic portal Economedia.ro reported on Monday. 

The agreement on the construction of the Mátészalka-Szatmárnémeti expressway was signed in 2021 by Minister of Foreign Affairs and Trade Péter Szijjártó and the then Romanian Minister of Economy, Entrepreneurship and Tourism Claudiu Nasui.   

Christened the Szamos Express

The Satu Mare-Ovari road, to be built by the Romanian side, will be 11 kilometres long, with two lanes in each direction, two junctions and two car parks. Currently, the connection between the city in the Partium region and the Romanian-Hungarian border is provided by the DN19A Romanian dual carriageway, which is a one-lane road, but traffic is difficult in some sections due to heavy traffic.   

The expressway, called the Szamos Express, starts from the Satu Mare ring road and reaches the Romanian-Hungarian border at Oar. On the Hungarian side, it connects at Csenger with the M49 motorway under construction, which branches off from the M3 motorway, thus linking Satu Mare to the European motorway network. 

A new road link to Hungary is also being established in Bihor County

According to the tender published in the Romanian public procurement electronic system (SEAP), the Satu Mare - Ovar expressway must be built in two years. The value of the project ranges from 738 to 832 million lei (57.8 to 65.1 billion forints). The deadline for submitting bids is 14 March. 

Economedia.ro reminds that, in addition to the connection in Satu Mare county, a new road link with Hungary will be established in Bihor county. The tender for the Oradea-Arad motorway, which will reach the Hungarian border at Salontas and connect to the M44 motorway, will be published in the near future. The project is the first of its kind in Romania to be carried out in cooperation between the two county councils of Bihor and Arad.

Source : Link

Popular