Industry news

A Hungarian company has come up with an unprecedented development in building services engineering

Published

The solution is that the heat emitting surface is the glass itself, so there is no need for any other heating equipment or conventional heat emitting surfaces in the building to be heated.

One of the globally unique building engineering developments of recent years, based on a Hungarian innovation, has entered the product phase and is now available for order from the Hungarian manufacturer: the heating glass produced by EGW Technologies uses the window surfaces as heat emitters, EGW Investment Kft. told MTI.

The essence of the EGW solution is that the heat dissipating surface is the glass itself, so there is no need for other heating equipment in the building to be heated, or for the usual heat dissipating surfaces - radiators, tubular floor and wall heating, heating panels - explained the head of the manufacturing company. László Szentesi added that, when used as the sole heating solution other than mains electricity, EGW only requires a glass surface covering 20-30 per cent of the floor area to be heated, which is almost always a given in a newer building.

The heating surface does not change the operation of the windows in any way

The efficiency of the system, which also works as an infrared radiator, is comparable to the most modern heating technologies, as confirmed by the 2022 scientific laboratory test of the Faculty of Engineering and Informatics of the University of Pécs. The highly environmentally friendly solution can be controlled in any conventional way, measures humidity and temperature, and its own smart home software can be used to remotely or automatically control ventilation, air conditioning or shading systems.

László Szentesi pointed out that this heating surface does not change the operation of the windows in any way, so they can still be opened, blinds can be placed on them, the glass is not reflective, and its transparency is not affected. The EnerGoWindow is manufactured in a factory in Veszprém. The product cost around 100 million HUF to develop and start production.

EGW Investment Kft. was founded as a micro-enterprise on 27 December last year by László Szentesi. The company's projected turnover for this year is HUF 400-500 million, he said.

Source : Link

Popular