What is being built?

The health facility in the large town in the lowlands has been rebuilt

Published

Another medical clinic has been renovated in Szolnok, and patients are now being seen in the building, which was modernised with around half a billion forints.

The clinic in the southern part of Szolnok has been renovated with more than 487 million forints in EU funding, according to info.szolnok.hu. The 650-square-metre clinic on Temető út and its nearly 600-square-metre roof have also been modernised. The work on the medical clinic was carried out by KELET-ÚT Építő Kft.. The aim of the project was to provide the population with high-quality public services and to enable primary healthcare to operate more effectively and efficiently in the county seat. During a tour of the facility, Mayor Ferenc Szalay recalled that three other clinics in the city had previously been modernised, with one renovation still ongoing.

Renewed interiors

The former building has been enlarged, and the functionless inner courtyard has been covered and will be used as a central reception area.

A new electricity, gas, water, sewage, heating and cooling systems have been installed in the clinic. All the windows and doors in the building were replaced. Half a hundred new windows were installed on the façade alone.

Photo.

The interior works included the insulation of around 680 square metres of flooring and the renovation of a total of 2,153 square metres of wall surfaces. Modern toilets for children, women and men and a barrier-free toilet with emergency call equipment for patients were also installed. All surgery and consultation rooms have been equipped with toilets with medical taps.

Increase comfort by installing a modern cooling and ventilation system

During the modernisation of the heating system, the contractors installed a new gas-fired boiler, almost a kilometre of five-layer piping and panel radiators in the rooms. The building's ventilation system was also upgraded, including the installation of a heat recovery ventilation system, 14 roof vents and a network of ducts and fans, as well as 40 fans and extractors. The roof of the building was insulated against heat, sound and rainwater. The façade was also insulated, in addition to new windows and doors.

The energy renewal included the installation of seven solar panels.

The renovation also affected the building's water and wastewater systems. During the works, nearly 1,300 metres of drinking water pipes and tubes were dismantled and replaced.

Cosy gardens, new parking spaces for doctors

The surroundings of the building have also been beautified. Eleven parking spaces with asphalt paving have been created. Red pine trees were planted, 880 square metres of lawn were laid and street furniture was installed near the clinic. The modernised building has been open to patients since 5 February. In addition to paediatric and adult general practitioners, the clinic also offers dental care, including school dentistry, and a new nurse midwife service has started operating.

Source : Link

Popular