What is being built?
Scaffolding will soon be removed from the new Semmelweis Imaging Centre
According to Péter Kis's plans for Plant-Atelier, the Épkar Zrt. will be built at the Semmelweis University"s new Imaging Centre at its Cardiology and Vascular Medicine Clinic on Városmajor Street. As revealed in Épkar's Facebook post, one of the world-renowned institution's largest current investments has now begun to take shape.
With its full layering completed, the varied pitch, corbelled sheet metal roof is now being installed by the contractor's staff.
Meanwhile, the new building is being fitted with the facade cladding and the windows and doors have been installed. The structure of the bridge linking the second floors of the two buildings is already in place, and the glass surfaces will soon be installed.
Comprehensive development
Our country's largest healthcare institution is making huge infrastructure improvements. In addition to general maintenance, the university is expanding and modernising many of its buildings. In the past year alone, we have reported the development of ten teaching spaces:
- Pulmonary clinic
- National Cardiovascular Laboratory
- Merényi Clinical Centre
- Dental and Oral Surgery Training Institute
- Pető Institute
- Institute of Anatomy, Tissue and Developmental Biology
- Theoretical Education Centre
- Hőgyes-Schöpf-Mérei pharmaceutical research centre
- Institute of Pathology
- Digital Health Institute
One of the biggest undertakings in this series is the expansion of the Heart and Vascular Clinic on Városmajor Street with a new seven-storey building, which will blend into its surroundings with a grid-like facade, varied roof planes and a large, intensive green roof. The project is also technologically very advanced, as it will increase the diagnostic capacity of the clinic and enable cutting-edge diagnostic training.
Source: Link
-
Road building 2026. 08. 05.
The main road leading to a key tourist destination in Bihar is being upgraded using cold recycling technology
-
What is being built? 2026. 08. 06.
Paks II.: What does the new milestone for Unit 5 mean in the context of the review?
-
Climate-X 2026. 08. 05.
STRABAG is relieving the strain on the electricity system through plant shutdowns and reorganised production
-
Bound track 2026. 08. 03.
Work on the extension of Metro Line 3 is set to begin