What is being built?
University of Miskolc students can live in a stimulating environment
The apartments will first be occupied by participants in the U20 Women's Basketball European Championship Division B, held between 2 and 10 August, and from September onwards, university students will be able to move into the building, which has been equipped with state-of-the-art mechanical and insulation systems thanks to the work of Épkar Zrt.. The dilapidated socialist-realist block already
Air-conditioned rooms, apartments with kitchenettes and private bathrooms, laundry and cooking facilities, and a communal area will be available for students.
The university of renewal
"The University of Miskolc is a university of renewal, adapting to the world around it while preserving its centuries-old values. Universitas, which teaches and researches a wide range of sciences, provides a lifelong education. Graduates and knowledge acquired here have value and quickly pay off in the labour market."
This is how Prof. Dr. Zita Horváth, the university's rector, defined her own university. A truly enormous transformation is taking place at the University of Miskolc: by 2026, the university's all of its halls of residence will be renovated; the university restaurant and its surroundings; and in 2024, the Miskolc Scientific Data Analysis Methodology Centre and Open Research Data Repository was handed over in 2024.
Their aim is to increase the prestige of the university and thus the city of Miskolc, and to strengthen the long-established institution as a leading scientific and technical workshop in the region by attracting more students and market partners.
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
Current at 2026. 10. 05.
Sofitel Hotel is the only Hungarian project in the running for the Dalux Award 2026 award – Watch the video too!
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
