What is being built?

MKIF has published a new video of the M1 extension

Published

<b>Emergency landing bay earlier, during construction (Photo: MKIF)</b>
One important element of the new temporary traffic order, which will be built in several phases, will be demonstrated: emergency stopping bays.

Another animated video has been published about the expansion of the M1 motorway rel="noopener"> M1 motorway expansion project by MKIF Magyar Koncessziós Infrastruktúra Fejlesztő Zrt. The project, covering a section of approximately 80 kilometres, will see the resurfacing of the motorway from the M0 motorway to the Concó rest area in the Ács and Bábolna area, and the expansion of the M1 to 2×3 lanes + ITS lane (the latter abbreviation stands for intelligent hard shoulder). MKIF regularly publishes work logs and videos about the work on Facebook, which we also view.

The infrastructure for a secure foreign travel regime has been developed separately

They have just posted that the emergency lay-bys on the sections affected by the expansion have been completed, and they are demonstrating how they work in their latest post. Following the introduction of the new temporary traffic arrangements, the lay-bys created in the central reservation, next to the outer lane and next to the work area can also be used if necessary.

The animation below shows how to access and use these bays from which lane.

The aim is to be able to leave the active lanes as quickly as possible during the extension in the event of a technical problem or any other problem, they point out, adding that in addition to the bays, a truck rescue service will be on standby at the engineering sites involved in the extension, from 0 to 24 hours, so that the track can be freed up as quickly as possible in the event of a technical fault or accident.

Source : Link

Popular