Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • The contractors for the Szolnok spa have brought a lawsuit against the city to secure payment of their final invoice

    • An exemplary model from Borsod – the synergy between father and son is driving Mento Csoportot forward

    • Class HE-DO brought the summer to a close with a family sports day

    • Summer BridgeCamp: SZABADICS shows young engineers what the construction industry is really like

    • A first-hand look at a career in engineering – Duna Group Szabadegyetem is back

  • Paks II
  • MKIF
  • What is being built?
    • Renovation work is set to begin on dozens of public buildings in Terézváros

    • The new industrial production hall could boost economic development in Matyóföld

    • The Mercedes nursery in Kecskemét has doubled its capacity

    • The Austrian Luegbrücke is being rebuilt across mountains and valleys

    • Four blocks, 254 flats: structural work on the Csepel apartment block is progressing using PERI systems

  • Climate-X
    • Szeged is set to regenerate an entire neighbourhood as part of a large-scale green project

    • Regionális Szárazgazdálkodási Együttműködés was founded in Debrecen

    • The first municipal thermal power station in Transylvania is under construction

    • From the heating plant to the library – solar panels are to be installed on eight local authority buildings in Kiskunfélegyháza

    • The construction of huge water reservoirs would help to strengthen Debrecen’s drinking water supply

  • Bound track
    • Test trains are rattling along the new Slovenian railway viaduct

    • Nearly 880 tonnes of crushed stone are being moved on the 1-es vasútvonalon – track conditions are improving over a 600-metre stretch

    • Railway development is coming to the Hungarian Puszta too: Hortobágy station is being refurbished with an accessible platform and track works

    • The new section of the Buda interconnecting tram network could be built in three construction phases

    • Déli railway station is set to undergo a major refurbishment, paving the way for double-decker trains

  • Industry news
    • The road construction sector celebrated its half-century anniversary in Eger

    • Spectacular arches, ingenious solutions – the designers of the FŐMTERV present Venice’s award-winning bridge

    • A space brimming with information and encounters – that’s what the Infotér CONTECH was like

    • Off to Lake Balaton – Contech for the third time!

    • The refurbishment of Citadella has won an international award – 14,000 square metres of historic stonework have been restored

  • Magyar Építők

Közlekedéstudományi Egyesület

  • Industry news40 minutes ago

    The road construction sector celebrated its half-century anniversary in Eger

    János Fónagy, who delivered the opening address, has been a regular participant at the sector’s summit for 30 years now; for the past nine years, the event has also served as a gathering for the entire transport industry. At the event, the...

More Posts
  • Latest
  • Popular
Industry news2026. 10. 18.

The road construction sector celebrated its half-century anniversary in Eger

Water management2026. 10. 17.

Young skilled workers can set off on their apprenticeship placements today as well

Industry news2026. 10. 16.

Spectacular arches, ingenious solutions – the designers of the FŐMTERV present Venice’s award-winning bridge

Road building2026. 10. 16.

Fót and Dunakeszi are finally to get a cycle route linking the two towns

Industry news2026. 09. 19.

Duna Aszfalt paid more than 10 billion forints in interest to state-owned banks

Climate-X2026. 09. 22.

From the heating plant to the library – solar panels are to be installed on eight local authority buildings in Kiskunfélegyháza

Industry news2026. 09. 19.

The cream of three industries in one place: the HOMEINFO Építőipari, Faipari és Kertépítő Mester Workshow is coming!

What is being built?2026. 09. 23.

Another block of flats could be extended by two storeys in the Ferencváros regeneration area

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections – BC Zrt. – 18 October 2026.