It is no longer an exaggeration to refer to our south-western motorway as a ‘new death trap’, but the launch of a Serbian motorway project with a telling name could offer a solution. We have looked at what improvements might divert traffic...
The operator-general contractor MKIF is working on the bridge with as few closures as possible.
The Pentele Bridge, which is actually a set of five separate steel bridges, will have a total of 13 spans replaced.
The new junction, to be built by Duna Group, will be built at the junction of the M44, the M5, the 5 and the future M8.
Around 27 kilometres of the M6 and the M8 are being resurfaced, and a number of junctions and rest areas are also being replaced.
As part of the V0 bypass.