The façade can be restored whilst preserving the historic plasterwork.
The spire of the Roman Catholic Church of Prince Saint Imre in Döbrököz has been renovated with state funding. The 25 million forint investment serves to preserve one of the most significant architectural elements of the town.
The parish received a total of HUF 550 million in state funding for the four-year project, which was full of structural challenges.
This was the biggest development in the Tihany Abbey since the building was built in the Baroque period.
The cemetery chapel of Vértesszőlős, which had become a threat to life, once again stands with its old elegance over the valley of the Által river, thanks to CEMIX materials.
The church of St Ignatius of Loyola in Győr has a modern roof thanks to the work of WHB.
An outstanding example of European Gothic architectural heritage has been superbly restored.
The monument known as "Old Michael", which was altered during an intervention a century ago, will be restored to its original sound.
For the restoration of the masonry of the monument, the professionals used the Mapei cementless dry plaster system.
In addition to repairing damage, the restoration of the nearly 240-year-old building is focused on longevity, and Cemix products have provided the solution.