The International Olympic Committee awarded a prestigious architectural prize to the facility, which was handed over under the general construction of the ZÁÉV and Magyar Építők consortium.
A forward-looking electricity storage system will be created in the project implemented by WHB ELEKTRO Kft., which will be able to feed into the grid in a controlled manner.
The general design of the facility, built by the consortium of ZÁÉV and Magyar Építő, was carried out by NAPUR Architects.
The roof structure of the Athletics Stadium, built by KÉSZ Csoport, has been shortlisted for the Structural Awards 2024, which assess the world's most impressive structural designs.
For the 14th time, an online vote will decide which of the 35 nominated sports facilities will win the award.