The rainwater drainage system for the part of Sümeg located above the A84 main road is being resolved by utilising the site of an abandoned gravel pit. A key element of the project is the construction of a new retention and infiltration basin, which will...
A stormwater drainage and stormwater reservoir is being built in Tokaj to channel water from the mountain.
Zalaegerszeg is to improve the banks of two streams. The Nagypáli stream would have stormwater reservoirs built, while the Ságodi stream would have a 900-metre stretch of its bed modified to allow for controlled, damage-free drainage of water...