Road building
The Engineer who deserves to be glazed on the new section of the M44
One of the leading experts in the Hungarian construction industry received recognition worthy of his career when the complex rest area named after László Mosonyi was inaugurated on 19 April on the M44 Lakitelek-Szentkirály section. The general contractor for the 4.6-kilometre section built as part of the Építési és Közlekedési Minisztérium investment was Duna NRG Zrt., which is part of Duna Group. As we indicated indicated at the subsequent official handover of the new expressway section, the complex rest area in question was built at the junction of the 4623 and M44 roads leading from Szentkirály to Tiszakécske, together with a separate-level junction.
Before the inauguration of the rest area with the smart lighting system, the contractor and the client's employees took a bicycle tour of the newly completed section, in line with tradition.
The Duna Aszfalt also played a significant role in the market penetration of
According to the speakers at the event, the unveiling of the memorial plaque in honour of László Mosonyi is a significant step not only for Duna Group, but for the entire Hungarian road construction profession, as the engineer was one of the outstanding experts in Hungarian civil engineering. During his highly successful, internationally renowned career, he led the Duna Aszfalt Zrt. contracting management for several years, so the leading company with its roots in Tiszakécske took the initiative to honour his work with the construction of the M44 in Bács-Kiskun County.
The ceremony, attended by the family of the former engineer, also commemorated the fact that László Mosonyi was born in Békéscsaba, so it is a nice gesture that travellers will meet his name every day on the M44 motorway, which will connect his hometown to the expressway. At the same time, it was also mentioned how he has played a significant role in the development of Duna Aszfalt as a business director:
under his leadership, the company won its first major foreign contract in 2007, as well as the civil engineering works of the Mercedes factory in Kecskemét in 2009 and the first Hungarian motorway construction project in 2012.
He may also have managed the construction of a Mediterranean port
Before his death in 2016, László Mosonyi played a leading role in the preparation of the GED Africa project, which was regularly covered by our newspaper. The latter is currently the largest single private infrastructure investment in Africa from Europe, with Duna Aszfalt Zrt. as its professional and investment partner: the development will see the construction of a new border bridge between the Democratic Republic of Congo and Zambia, as well as the construction and renovation of 184 kilometres of road.
The African project is based on the unique work experience of László Mosonyi, who spent 12 years building roads, bridges, roundabouts and training professionals in Algeria. In the same country, he also managed the construction of a Mediterranean port.
A similar achievement was made in Côte d'Ivoire, where he managed to set up a road-building project without modern technology by organising the locals, sometimes taking on the physical work. Later, in the Congo, he was involved in the start-up of road construction work for a state-owned company and gave technical lectures. Even in retirement, he remained active professionally, having been involved in the construction of a road network in Zambia in 2015.
The African dream is coming true
In his speech at the event, László Szíjj commemorated László Mosonyi as the Engineer with a capital letter, mentioning the clarity, calmness and determination that emanated from his person. He did not hide his emotion when the engineer first proposed to the owner of Duna Group that the company should take part in the GED Africa project, and then when, after his death, the decision was taken to get involved in the project.
"I would now like to announce to Laci's family, to you and to us, to Duna Aszfalt, that this dream is coming true, we are going to do it!" - said the founder-owner. In closing, he encouraged everyone, when passing the pitch by the rest area, to give a smile to the professional who was looked up to deservedly by everyone at Duna Aszfalt.
Source : Link
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
-
Bound track 2026. 10. 08.
Déli railway station is set to undergo a major refurbishment, paving the way for double-decker trains

