Road building
Motorway also under construction on the eastern side of the Mohács bridge
The Official Gazette 59. issue of the Official Gazette on 30 December last year, the Minister of Construction and Transport issued instructions regarding developments affecting the town of Mohács. In order to ensure the successful implementation of the Bácska project, János Lázár assigned a number of tasks.
Transdanubia and the Great Plain will also get four lanes
The list includes, among other things, the implementation of the Mohács Danube Bridge and the related road network development.
At the same time, on the lowland side, the decree envisages the construction of a 2×2 lane road, so the new 20 km long road starting from the main road 51 near Csátalja will be built as a four-lane road up to Újmohács.
The content of the Official Gazette was confirmed by János Hargitai, Member of Parliament, who stated János Hargitai, Member of Parliament, who spoke to pecsiujsag.hu. „According to the original plans, this section would have been a single lane in each direction, but according to the recent decision by Építési és Közlekedési Minisztérium, the road will have two lanes in each direction,” the news site quoted the politician as saying.
As a reminder, the overall Mohács bridge project Duna Aszfalt Zrt. includes the construction of a 756 m long bridge over the Danube, in addition to the above, with a continuous 8.5 km long 2×2 lane road on the Transdanubian side to the M6 motorway.
A railway would connect Mohács and Bátaszék
The list in the Official Journal also included the following tasks:
- the launch of a conditional public procurement procedure for the design of the development of the Pécs-Szigetvár section of the M60 motorway;
- the feasibility study for the continuation of the Mohács bridge and road link from Csátalja to Bácsbokod on the section between main roads 51 and 55;
- the construction of a four-lane section on the eastern side of the Mohács Danube Bridge, the construction of the Homorúdi access junction, and the construction of a rest area in the Sárhát-Újmohács area in consultation with the Mohács City Municipality;
- Feasibility Study for a possible Mohács-Bátaszék railway line
Source : Link
-
Kirakat 2026. 10. 01.
A leading machinery distributor in the construction and haulage sectors is building a new service centre and extending its existing premises
-
Industry news 2026. 10. 02.
Hungary has joined the single electricity market
-
Railway development 2026. 09. 29.
The railway line leading to the Hungarian border is also set to be upgraded as part of Croatia’s large-scale development programme
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
