Water management
It’s not just paving stone – it’s decorative paving! The VIASTEIN LUX represents a new standard in premium outdoor solutions
When choosing paving, it is no longer just durability or functionality that matters. A tastefully designed environment shapes the first impression, whether it be a public building, a company premises or even a family home.
The VIASTEIN Kft. offers a high-quality solution to this need, having been a leading player in the domestic paving stone industry for many years. The brand has already proven itself as a paving solution for numerous urban squares, public spaces, industrial developments and residential properties.
Quality that pays off in the long run
When it comes to outdoor flooring, durability is one of the most important considerations. Weather, frost, UV radiation and constant wear and tear are challenges that only high-quality products can withstand over many years.
The advantages of the VIASTEIN over other paving stones
– longer-lasting protection of colour and surface,
– easier to clean and
– versatile applications, e.g. suitable for paving pavements, terraces, gardens, courtyards, car parks and public spaces.
This summer, the distributor launched its new product range, the VIASTEIN LUX, which, thanks to its surface treatment using proprietary technology, represents the luxury segment within its product range. The collection is available as complete design systems, in a variety of sizes and finishes.
Where style meets durability
Thanks to the innovations in the VIASTEIN, LUX cladding is not only aesthetically pleasing but also durable, ensuring that it retains its appearance and technical properties in the long term. This is particularly important for projects where sustainable operation and low maintenance requirements are key considerations.
With its unique surface finishes, the decorative cladding has an elegant, sleek appearance, whilst state-of-the-art manufacturing technology ensures high wear resistance and durability.
The CleanProtect technology is one of the key features of LUX
The surface of the VIASTEIN LUX decorative cladding is protected by the CleanProtect technology, which makes the product resistant to weather and environmental factors and easy to clean.
Two special features of the cladding:
undergoes subsequent surface treatment during the manufacturing process,
– During the final stage of production, a protective coating is applied to the surface of the paving stones (Clean Protect), which seals the pores in the concrete, thereby ensuring protection.
The CleanProtect technology
- highlights the colours of the flooring,
- protects the surface from dirt,
- helps to ensure rapid surface drainage,
- contributes to a more lasting, attractive appearance.
In other words, it is not simply a matter of paving stones being „more attractive”; rather, the visual appeal and surface protection technology together create the LUX product experience.
One of the greatest advantages of LUX decorative flooring is its versatility. Its appearance makes it a worthy choice for flooring in prestigious public spaces, corporate environments, office blocks or institutions, whilst the same elegance is equally at home in a family home.
Source: Link
-
Industry news 2026. 08. 18.
Students were introduced to the high-tech construction industry at BME’s field camp in Göd
-
Bound track 2026. 08. 17.
New pedestrian crossings and a junction with traffic lights are being built in Angyalföld
-
What is being built? 2026. 08. 18.
Hungary’s new McDonald’s restaurant has moved into a modernist listed building in the centre of Budapest
-
What is being built? 2026. 08. 18.
New paving, a playground and visitor facilities are being planned for the Várkör area in Pannonhalma