Property
Three parallel construction sites in Biatorbágy with Leier products
The Szarvasugrás housing estate on the western border of Biatorbágy, the Ybl House "B" building on the Ybl promenade in the central part of the town and the Service House under construction in the centre are being built together. The parallel construction of the three projects will be accompanied by careful planning and close collaboration, taking advantage of the Leier's precision in prefabrication, delivery and scheduling.
Building on the advantages of a conurbation city
The five-storey buildings of the Szarvasugrás residential park, equipped with an underground car park, are being built on the green outskirts of Biatorbágy, on the border between Pest and Fejér counties, with complex prefabricated solutions from Leier Hungária Kft.. The fifth phase of the project is already underway, with buildings offering 40-40 apartments, each with a usable floor space of 2,200 square metres, in which Leier climate ceilings and an efficient heat pump system contribute to outstanding energy efficiency.
In parallel, the 36-apartment Ybl House project is also being built using the proven prefabricated structural elements of Leier, with the ground floor structure of Building B under construction, while Building A is in the finishing stages. As the Ybl Promenade is located in one of the most visited areas of the city, in a landscaped environment, the solution of underground parking has been a priority.
The 60-space underground garage built with Leier elements has already been completed in 90%.
In addition to these condominiums, the investor can also build a new service building for the city centre of Biatorbágy, which is already at the roof level. The ground floor of the uniquely shaped building will house a beauty salon and a street food restaurant, while the upper floors will be used for offices and apartments.
Shared values, common thinking
The complete structure of each building is made of prefabricated Leier components. The hall garage walls, lift walls, staircase and partition walls are made of Leier bark walls with excellent sound insulation properties (25 cm thick reinforced concrete walls provide 60 dB sound insulation), while the slabs are made of Leier air-conditioning slabs, known for their excellent thermal insulation properties, and Leier Mesterpanel slab elements, popular for their flexible use. The use of Leier prefabricated staircases, whose precise production greatly facilitates the work of contractors, also significantly speeds up construction.
"It is a challenge to coordinate the construction of three parallel projects as accurately as possible, but the contractor's many years of experience, as well as the quality of Leier's prefabricated products, the punctual and fast delivery and the professional support provided by the company, will help the projects to be completed ahead of schedule"
- we learned from Leier. This is greatly enhanced by the fact that there is no possibility of construction errors in the factory-made walls, which significantly speeds up on-site construction time and reduces the need for live labour.
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
Current at 2026. 10. 05.
Sofitel Hotel is the only Hungarian project in the running for the Dalux Award 2026 award – Watch the video too!
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
