What is being built?
A new level of automotive training at the Fáy András Technical School
In connection with the project entitled "Complex Development of the Budapest Mechanical Engineering Training Centre", the institution published a conditional procedure in the EU Public Procurement Bulletin in a conditional procedure. Bids are expected by 8 August 2025.
The project is located in the courtyard of a locally protected building complex in the IX district, on the area bordered by Lenhossék, Mester and Márton streets. The technical school, built in 1924, has long been an important base for automotive vocational training in Hungary and has been a partner of Toyota Central Europe since 1998.
The new centre aims to create a modern and energy-efficient two-storey building of 823.99 m² of floor space after the demolition of the existing three-storey ground-floor workshop.
Modern teaching spaces and a green roof over the hybrid workshop
The ground floor of the new building will house state-of-the-art workshops where students can work on real vehicles, manholes and lifting equipment. The workshops will be designed with special attention to the specific needs of education on alternative propulsion vehicles, including hydrogen-powered models. Accordingly, an intensive green roof will be created above the hybrid workshop instead of a space not suitable for long stays.
The central axis will house the service rooms (washrooms, workshop, hazardous waste storage) and the vertical lift. On the upper floor, there will be group rooms and an acoustically designed auditorium separated by a movable wall, while the mechanical room will be located at gallery level.
Sustainable building and modern building services
The new knowledge centre will be a monolithic reinforced concrete structure, with slabs of reinforced concrete reinforced with ribs. Special attention has been paid to fire protection and aesthetics in the architectural design of the building.
The building services system is fully implemented in a sustainable way. Heating and cooling is provided by air-to-air variable-volume heat pumps (VRV), renewable energy sources are combined with solar panels and heat recovery ventilation. Minimising thermal bridges, external shading, appropriate glazing and the use of green roofs all contribute to passive energy savings.
The aim of the project is to provide future automotive professionals with an environment that meets all the latest educational and technological requirements.
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
Current at 2026. 10. 05.
Sofitel Hotel is the only Hungarian project in the running for the Dalux Award 2026 award – Watch the video too!
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
