What is being built?
Industrial park to be built along the M60 motorway
Six plots with public utilities are available for companies in the industrial park in Szederkény.
The entire cost of connecting the 7.1-hectare area to public utilities will be covered by a non-repayable grant from the Regional and Local Development Operational Programme Plus (TOP Plusz). The work site has already been handed over to the experts of VivaPalazzo Zrt., who have been commissioned to carry out the construction work and will build the shared infrastructure network serving the six plots.
The road network in the area is also being developed.
As part of the project, the transport links of Route 57 and the industrial area passing through the town will be rebuilt, an internal road network will be constructed in the industrial area, water supply, sewage and rainwater drainage systems will be installed, and the area's energy supply and public lighting networks will be developed.
Industrial areas to be developed at seven locations in Baranya County
Quoting Mayor Balázs Maml, the announcement highlighted that there are already nearly 200 businesses operating in the town; the new economic zone near the M60 motorway exit will be created to serve these businesses. According to János Hargitai, Member of Parliament for the region, the Danube bridge currently under construction in Mohács will bring the region into the „mainstream of European economic circulation”. László Őri, president of the Baranya County Council, added that the development of the industrial area in Szederkény is part of a larger industrial development package in Baranya County, under which new industrial areas and economic zones will be established at seven locations in the county with a total investment of more than HUF 4 billion.
Source: Link
-
Industry news 2026. 08. 18.
Students were introduced to the high-tech construction industry at BME’s field camp in Göd
-
Bound track 2026. 08. 17.
New pedestrian crossings and a junction with traffic lights are being built in Angyalföld
-
What is being built? 2026. 08. 18.
Hungary’s new McDonald’s restaurant has moved into a modernist listed building in the centre of Budapest
-
What is being built? 2026. 08. 18.
New paving, a playground and visitor facilities are being planned for the Várkör area in Pannonhalma