Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • Communication is no longer a secondary activity, but a business tool

    • Where there’s a checklist for everything: how Imperial Holding organises safe and predictable house building

    • This is how the builders of the M44 motorway demolished the old bridge on the M5 – video

    • Engineering precision is a core value

    • Another major construction project has been launched as part of the Paks expansion

  • Paks II
  • MKIF
  • What is being built?
    • The market-leading Hungarian construction materials manufacturer is moving forward through product innovation and capacity expansion

    • A new, modern service area is being built on the M4 motorway near Monor

    • The development of the residential complex being built beside Lake Kána has reached an important milestone

    • Flex

      The new Flex factory in Zalaegerszeg demonstrates the strength of group-wide implementation

    • Flextronics is expanding its capacity in Zalaegerszeg with a new logistics centre

  • Climate-X
    • Concrete is not the antithesis of green solutions – Rainwater management in the age of climate change

    • Energy from deep underground: geothermal project gets underway in Mezőcsát

    • An Association of Energy Communities has been established in Hungary – a new era may be dawning for local energy production

    • A 100-metre road was built near Tata from 100 tonnes of waste

    • We can build on Europe's best assets – new sources for geothermal investments

  • Bound track
    • The unique solutions offered by the MEVA are supporting the work on one of the country’s largest railway projects

    • Plans are in place to stabilise the embankment along a critical section of the Lake Balaton railway line

    • Several railway bridges and sections of track are being renovated in the north-east of the country

    • Bridge installation, structural work, tree planting: the Southern Circular Railway had a spectacular February

    • The winner has been selected for the implementation of Phase II of the Buda tram network interconnection project

  • Industry news
    • The flagship of the Austrian construction industry has launched its largest investment project in Nyíregyháza

    • Self-criticism? Collaboration? Knowledge? What is missing from the Hungarian construction industry? Powerful insights from the head of Weinberg at the Portfolio conference

    • The trend has reversed: the shortage of skilled workers in the construction industry has increased once again

    • Serving the community and culture both inside and out – A commemorative plaque was unveiled at the award-winning Szekszárd Knowledge Centre

    • Three leaders, three perspectives, one direction – Key takeaways from SZABADICS at the Portfolio Construction Industry Conference

  • Magyar Építők

DHJ Építő Kft.

  • What is being built?4 months ago

    A new chapter begins in the life of the Miskolctapolca Cave Bath: large-scale reconstruction begins

    The first phase of restoration following the fire will cost nearly 768 million forints. The development will affect the entire electrical, mechanical and architectural systems of the baths.

More Posts
  • Latest
  • Popular
Road building2026. 04. 02.

The HE-DO has increased the capacity of Debrecen’s key transport hub

Road building2026. 04. 02.

Test piling is already underway at the junction of the M100 and M1 motorways, which is currently under construction

Water management2026. 04. 02.

AVK already accounts for more than half of the water utilities market and is now set to expand into the agricultural sector

Property2026. 04. 02.

A new residential complex is being built along the Váci út office corridor, alongside road resurfacing and public space improvements

Road building2026. 03. 10.

How M1 will change in the coming years – 40 minutes on the past, present and future of M1

What is being built?2026. 03. 27.

A new, modern service area is being built on the M4 motorway near Monor

Bound track2026. 03. 07.

Demolition of embankment begins on closed section of Ajka-Veszprém railway line

Current at2026. 03. 07.

Péter Szijjártó: Bayer Construct has become Europe's leading construction conglomerate

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections - BC Zrt.