What is being built?6 months ago
The largest Hungarian university can save the annual energy demand of a small town by modernising
The oldest continuously operating higher education institution in Hungary would reduce its energy consumption by the equivalent of the annual consumption of more than 3,400 Hungarian households. The contract was signed with the contractor of the ELTE Lágymányosi...