Project KÉSZ Csoport has refurbished six treatment rooms at Bethesda Children’s Hospital
The M5 motorway is in tatters – can the M6 save the day?
Concrete could be the future of detached houses
Up to 1,500 cubic metres of concrete are being poured in each phase of the Paks expansion
Is this what happens when Szolnok embarks on a new project?
A comprehensive programme is being launched to develop cultural buildings in Nyíregyháza
Mezőtúr’s 127-year-old public building is to be renovated
After three decades, the Várpalota sewage treatment plant has switched to new technology
This is what the refurbished Fonyód harbour looks like – a video of the KÉSZ project
The new logistics hall at Alsónémedi, connected by a bridge, is being built based on the design of the MERKBAU
The redevelopment of the mining site will protect Sümeg from flash floods
Who is taking the lead in the construction industry’s green transition?
Rain gardens are coming to Budafok, with over 3,000 square metres of green space set to be developed
Green Minimum and the life-cycle approach: the construction industry may be on the cusp of a regulatory shift
Debris-trapping systems are to be installed to protect the railway line in the Danube Bend
A new railway loading facility is being built in Tata as part of a comprehensive development project
Steady growth, expanding presence: DB Cargo Hungária is building a long-term future in the region
A new chapter in the Hungarian bridge-building industry – we explored the most exciting sections of the Southern Circular Railway
Work on the embankment is already underway, and trains will soon be running again on the revitalised Transdanubian railway line
The modernisation of the Debrecen–Mátészalka railway line has entered the planning phase
Ahead of the Champions League final, he began to talk about the jewel in the crown of our built heritage
The domestic construction industry could see a boost – there is potential to unlock €16.4 billion in EU funding
The STRABAG in Szombathely prevented the release of asbestos-containing dust using a special sealing layer
Housing construction and EU funding could give the sector a boost
A new chapter in the Hungarian construction industry: the Minister for Transport and Investment has been appointed
The renovation of the Teleki Blanka Grammar School building, which is a listed building, could no longer be put off.