During the process, carbon dioxide, which is an industrial by-product, is converted into a valuable green raw material. The aim of the project, which is being carried out with the participation of KÉSZ Csoport, is to pave the way for carbon dioxide utilisation systems...
Lindab, one of Europe's leading air technology companies, has achieved an outstanding result in the Financial Times "Europe's Climate Leaders 2025" ranking. The company was ranked second in the "Construction...
Nearly 30% of the Market Építő Zrt. fleet of nearly 600 passenger cars are hybrid or pure electric.
Steel supplier H2 Green Steel and Lindab have signed a seven-year contract to further reduce carbon emissions.