Road building

The capital's busiest cycle path is renovated and redecorated

Published

The damaged pavement on the busy cycle path to Margaret Island will be replaced.

The Margaret Bridge cycle path will be resurfaced and the pavement signs will be refreshed, according to a statement from BKK. The reconstruction of the cycle path on the side closer to Margaret Island, which shares the pavement, will be carried out in two phases. From 8 July to 4 August, the section between the Sziget entrance and the Buda bridgehead will be reconstructed, followed by the section between the Pest bridgehead and the Sziget entrance.

The reconstruction of the cycle path will involve removing the damaged coating and laying a new red-coloured, salt-proof, roughened surface over the properly prepared, granulated base surface. In addition, the pavement signs and cyclist pictograms will be repainted and the tactile pavement sign between the cycle path and the footpath will be replaced.

How the project will affect traffic

During the renovation, cyclists and pedestrians can temporarily use the cycle lane on the outside of the road and the pavement.

During the works, the outer lane on the Buda side will be closed to vehicles, as a temporary bicycle lane and pedestrian section will be created there. During this period, only one lane will be available for vehicles on the bridge from Pest to Buda, so there may be temporary congestion on Szent István körút and the Pozsonyi út slip road towards Margaret Bridge.

In order to facilitate public transport, a temporary bus lane will be designated from the crossroads of Szent István körút Tátra utca to the start of the Margaret Bridge works, in the outer lane, which will also be used by cyclists until Pozsonyi út. For the duration of the works, only one lane will be available on the Margit Bridge from Pozsonyi út.

Source : Link

Popular