Industry news
How the bathhouse of the Hévíz Lake Baths can reopen
The government is providing HUF 381 million in support for the short-term restoration of the recently closed lake bath building at Hévíz Lake Bath, but long-term development plans are also being prepared for this health tourism facility of special importance, Bálint Nagy, MP for the region and State Secretary at Építési és Közlekedési Minisztérium. This is in line with the statement made today by Index reviewed by Index today.documents/4ef33f28215b95e015f6006c4114b49a2dfd6256/view" target="_blank" rel="noopener">Magyar Közlöny decision.
In his statement, the Secretary of State underlined:
The temporary replacement of the part of the building on the lake, which was closed this spring, is planned with central budget funds, so that the Hévíz Spa and St. Andrew's Rheumatism Hospital can provide all its services without interruption. A long-term development plan is also being prepared by the ministry, which could raise the whole facility to a higher level.
He explained that the €381 million in funding now being provided will be used to carry out the works needed to safely reopen parts of the lake, with the aim of rapid intervention to ensure access to the covered water. The Hévíz Spa and St. Andrew's Rheumatology Hospital, which operates the spa, is responsible for carrying out the short-term restoration. However, significant improvements are needed for the long-term operation of the Lake Baths. Építési és Közlekedési Minisztérium (ÉKM) is responsible for the preparation, coordination and implementation of investments for the long-term, comprehensive development of the facility. The development concept should be ready by the end of September.
Hévíz is an important holiday destination at European level
Hévíz is one of the most important health tourism destinations in the country, Europe's largest biologically active natural thermal lake built around the Hévíz Lake Spa's certified thermal water is connected to a complex service infrastructure, which primarily promotes the treatment of musculoskeletal diseases. One part of the facility, on the lake, had to be closed in March this year for structural reasons. The closure only concerns the building on the lake, the spa lake and other spa facilities are still in operation and waiting for guests," the State Secretary stressed.
Built in 1968, the lakeside bathhouse was last renovated in 2005, using state-of-the-art architecture according to the knowledge available at the time. Due to its specific architecture, structural design and purpose, the bathhouse has been subject to regular geodetic surveys since 2008. Surveys carried out in the autumn of 2024 confirmed significant movement of the central pile-supported building of the Lake Baths. Additional investigations found that gases flowing upwards from the bottom of the lake with the thermal water had damaged the pile heads.
Source: Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
Current at 2026. 10. 05.
Sofitel Hotel is the only Hungarian project in the running for the Dalux Award 2026 award – Watch the video too!
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
