What is being built?
Underground car park, open spaces and green solutions are already strengthening the University of Pannonia
The renovation of the lower campus of the University of Pannonia has reached its goal: on 5 October, one of the largest-scale developments in the history of the University of Pannonia in Veszprém was inaugurated at a ceremony.
As we have previously reported previously reported, the facility located in the city centre will house the WEST HUNGÁRIA BAU Kft. and VEMÉV-SZER Kft., partly within the framework of the European Capital of Culture programme, an underground car park was built, above which new surface car parks, a multifunctional community space and new outdoor sports facilities were created.
The benchmark for the transformation of Veszprém
The combined investment of almost HUF 15 billion was for the renovation of the campus, the modernisation of the heating system and the construction of the underground car park. The necessary funding was provided jointly by the ECF 2023 programme, the Hungarian State and the University of Pannonia.
The concept of the project was also closely linked to the development of Green City Veszprém, which, with the work of VEMÉV-SZER Kft., also focused on outdoor and park use. a continuous pedestrian zone was created in the city centre of Veszprém.
Priority for pedestrians
Speech at the handover ceremony
- Dr. András Gelencsér, Rector of the University,
- Dr. Tibor Navracsics Minister for Regional Development,
- Gyula Porga, Mayor of Veszprém, and
- Zsolt Csillag Chancellor.
According to the information provided, the main objective of the project was to create a university campus that is organically linked to the open space system of the city centre, directly connected to the urban spaces, and freely accessible and passable for pedestrian traffic.
A pedestrian priority traffic system has emerged by reducing surface parking and discouraging vehicular traffic.
Many points have enriched the University
A 200-space underground car park with 100 university and 100 business parking spaces has been created, located in the north-eastern part of the site, under the recreational community and sports area. The main motor vehicle entrance to the campus has been relocated, with ramp access to the underground car parks.
As part of the project, a new outdoor multifunctional pitch was built, which will provide the opportunity to play a wide range of sports.
In the course of the entire area, 2,257 m2 of paving was laid, 14,607 m2 of green space was arranged or created, and about 14,400 m2 of roads suitable for motor traffic were constructed.
Source : Link
-
Industry news 2026. 08. 18.
Students were introduced to the high-tech construction industry at BME’s field camp in Göd
-
Bound track 2026. 08. 17.
New pedestrian crossings and a junction with traffic lights are being built in Angyalföld
-
What is being built? 2026. 08. 18.
Hungary’s new McDonald’s restaurant has moved into a modernist listed building in the centre of Budapest
-
What is being built? 2026. 08. 18.
New paving, a playground and visitor facilities are being planned for the Várkör area in Pannonhalma