What is being built?
A seven-hundred-seat college is built on the site of a former barracks in the City of Sunshine
The University of Szeged has issued a public procurement tender for the construction of a new dormitory building. According to the announcement published in the EU public procurement bulletin, the U-shaped ground floor + 6-storey student residence will be built on the Science Park site. The plans for the dormitory were drawn up by 4D Építész Stúdió Kft..
Young people will be able to live in double or triple rooms
Before the construction of the Öthalmi Campus Dormitory can begin, the company that wins the contract will have to demolish the old school building on the site. The heating and hot water supply of the two dormitory buildings on this site will be connected to the new hostel's mechanical and energy supply system as part of the project. The new building will consist of a basement, ground floor and six additional floors. Of the 300 rooms in the dormitory, 290 will be double rooms and ten will accommodate three young people. There will also be guest rooms at one end of each floor, providing accommodation for 96 people in 43 rooms.
A four thousand square metre multi-purpose gymnasium is also being built
The communal spaces, kitchen, canteen and study rooms are located at the breakpoints of the U-shape stems. On the ground floor there will be barrier-free spaces, including rooms.
In the basement there will be a two-storey multi-purpose gym of almost 4,000 square metres, with a playground, classrooms and storage rooms. Next to the dormitory there will be parking and bicycle storage. The building will have a capacity for 706 people and will cover more than 20,000 square metres.
Work is in full swing in the park
The Szeged Science Park is being built around the ELI ALPS laser research centre. Of the 85-hectare site, the university is carrying out development projects on 20 hectares for educational and research purposes. The first facility in the innovation and science park, the Szegedi Tudományegyetem Incubator House, was handed over in 2022. At the same time, plans were announced for the construction of a visitor and conference centre, as well as a campus building. This also includes the Öthalmi Campus Hall of Residence.
As part of the Science Park project, significant infrastructure development is also underway, including the construction of 3.6 kilometres of water mains, 3.5 kilometres of sewerage pipes and a street lighting network. This work is being carried out by Colas Út Zrt. and DÉLÚT Kft..
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
Current at 2026. 10. 05.
Sofitel Hotel is the only Hungarian project in the running for the Dalux Award 2026 award – Watch the video too!
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
