The poor accident statistics on the 83 motorway, which also serves the Győr conurbation, may improve, and the journey time between Pápai airport and Győr has been halved.
Travel times will be significantly shortened and the road between Győr and Pápa will be safer thanks to the four-lane widening of the 83 road.
The engineers also had to tackle airport access, the excavation of former TSZ pipelines and the design of non-standard size structures.
The new bypass will link roads 8315 and 832, connecting the eastern border of Pápa, thus creating another important section of the ring road around the city.
The technical hand-over takes 30 days, as required by law, and the 36 km of road improvements were carried out under the general construction of Duna Aszfalt and Soltút.
The Pureco supplied type of slotted flow is used on the surfaces subjected to the highest loads.
Durisol noise barriers are continuously being installed in the spectacular project on the 83 road.
The finishing works are being carried out on the dual carriageway widening to two lanes on the Duna Aszfalt and Soltút generic sections.