The Fehmarnbelt Tunnel, the world’s longest submerged tunnel, will link Denmark and Germany. The first concrete section, measuring 217 metres in length, was lowered to the seabed in early May.
The first element of Poland's historic infrastructure project has been completed.
However, it will not be ready for the 2030 World Cup. According to plans, it will be possible to travel from Spain to Morocco in just half an hour.
We encountered forward-looking professional experience when we discussed the award-winning projects at the ÉVOSZ year-end gala with the experts from Duna Group.
The country's most valuable water snail habitat was discovered in Kács, Borsod-Abaúj-Zemplén County, on the site of a previously closed baths.
There is no room for error in the tunnel - MKIF technicians have checked all sensors, lights and displays - among other things. This is how safe and fast maintenance was carried out step by step...
The 22-kilometre section, which is being built by the Rome-based giant, will include 17 kilometres of tunnels, 9 bridges and two viaducts.
As part of the double-tracking of a 10-kilometre railway line.
The Romanian authorities have selected the contractors for a 37-kilometre motorway section worth HUF 494 billion at medium prices.
More than forty cameras continuously monitor the interior of the M85 tunnel, which is protected by numerous automatic safety features. In the event of an emergency, a pre-modelled...